News

Kaydon IT Completes US Coast Guard Hangar

The Cape Cod Coast Guard Hangar project consisted of the installation of a new site utility and communication infrastructure for the new 4-bay coast guard hangar facility.

Kaydon IT installed medium voltage cabling and transformers as well as new fiber optic cabling in preparation for the future hanger facility.

Specifically, we installed copper, hybrid single mode, multimode fiber backbone to the existing USCG base infrastructure.

Since security was an important aspect at the facility, we Installed a CCTV system with 31 cameras and 2 full time security guard monitoring stations including Pan Tilt Zoom camera controls. An Intrusion detection system was installed for sub zone control for classified areas. We also installed life safety and public address systems in the new Hangar tying it into the existing base system.

Newsletter Signup

Sign up for our email newsletter and stay updated on Kaydon Group news.